600 Ton Chiller Upgrade


Valdes Engineering Company provided the engineering services for installation of a new 600 ton electric motor driven, water cooled, centrifugal chiller. The project also included modification to two cells of the existing cooling towers so they would be available for winter operation as well as the installation of new inverter duty fan motors, bypass piping, control valves and modification of the operational control from 2-speed to VFD control.